Evaluation of the building information modelling (BIM) implementation in construction projects on Lombok Island using analytical hierarchy process (AHP) and SWOT analysis

Evaluation of the building information modelling (BIM) implementation in construction projects on Lombok Island using analytical hierarchy process (AHP) and SWOT analysis

Authors

  • Nurdin Nurdin University of Mataram
  • Hariyadi Hariyadi University of Mataram
  • Ngudiyono Ngudiyono University of Mataram

Keywords:

BIM, Obstacles, AHP, Strategies, SWOT

Abstract

Building Information Modelling (BIM) is a breakthrough in the construction world. BIM facilitates data validity with excellent visualization. In addition, data accuracy is also a major advantage of BIM applications for construction work. In this study, an evaluation of the implementation of BIM in construction work on Lombok Island was conducted. The evaluation resulted in strategies that can be applied to overcome obstacles to using BIM in the field. The data were obtained by giving questionnaires to 30 respondents spread across 4 large construction projects on Lombok Island. Furthermore, data processing was carried out by utilizing the Analytical Hierarchy Process (AHP) as a determinant of variables that influence the obstacles to the use of BIM and SWOT analysis to compile a method that is expected to be able to solve problems based on existing variables. Based on the data processing results, 21 variables were obtained, and six aspects were considered obstacles in the application of BIM. By ranking using AHP, 12 variables were obtained as a reference in determining strategies using SWOT. Then, seven strategies were obtained that can be applied to resolve the obstacles to applying BIM, as follows: Carrying out training activities to obtain a certificate of expertise; carrying out routine briefings to improve understanding of the duties and functions in BIM operations; improving the quality of human resources to overcome planning conventionally; procuring hardware following the regulatory standards of each application; procuring application licenses; recruiting BIM experts; and recruiting human resources to meet the requirements in BIM.

References

[1] Bosdriesz, Yvar. 2018. Towards a Reference Architecture to BIM Integration in Construction Industry. Faculty of Electrical Engineering. University of Twente, Enschede, Netherland.

[2] Gegana, Gregorius & Widjanarso, Tony H. (2015). BIM Course Development and Its Future Integration at University of Indonesia and Institute Of Technology Bandung, Indonesia. 9th BIM Academic Symposium & Job Task Analysis Review, Washington, DC, 7-8 April 2015.

[3] Johartiming, Evelyn Fedora. 2021. Investigation of Building Information Modeling Implementation in the Construction Sector in Surabaya. Petra Christian University. Surabaya.

[4] Kartika, Destiar U.A. 2022. Study of the Role of Building Information Modeling (BIM) in Construction Services Business. Master of Civil Engineering, University of Mataram. Mataram.

[5] Nasution, S. 1988. Qualitative Naturalistic Research Methods. Tarsiti Bandung

[6] Pratama, A. dkk. 2024. BIM Study of Building Information Modeling Implementation in Indonesia Based on Construction Executor's Perspective (Case Study: BUMN Contractor Project). Jurnal Teoretis dan Terapan Bidang Rekayasa Sipil. Institut Teknologi Bandung. Bandung.

[7] Rangkuti F., 2015. SWOT Analysis Business Case Dissection Technique, Jakarta: PT. Gramedia Pustaka Utama.

[8] Rusyanti, S.H. 2018. Comparative Study of Building Information Modeling (BIM) Implementation in Singapore and the UK Reviewed from Institutional Aspects. Direktorat Rumah Susun.

[9] Saaty, T.L., 1993, Decision Making for Leaders: An Analytical Hierarchy Process for Decision Making in Complex Situations, Seri Manajemen No.134. Cetakan Kedua, Jakarta: PT. Gramedia.

[10] Sugiyono. 2015. Educational Research Methods Quantitative, Qualitative, and R&D Approaches. Bandung: Alfabeta.

[11] Virgia, Srihayati Baiq. 2022. Sustainability and Feasibility Study of 3R TPS Using AHP and SWOT Methods in Central Lombok Regency. Master of Civil Engineering, University of Mataram. Mataram.

[12] Wibowo, Ary. 2021. Evaluation of BIM Implementation in Construction Projects in Indonesia. Master of Civil Engineering, Universitas Islam Sultan Agung. Semarang.

[13] Wook, W.S. dkk. 2016. Information Modeling (BIM) for Project Value: Quantity Take-Off of Building Frame Approach. International Journal of Applied Engineering Research ISSN 0973-4562 Volume 11, Number 12 (2016) pp 7749-7757.

Downloads

Published

2025-05-31

How to Cite

Evaluation of the building information modelling (BIM) implementation in construction projects on Lombok Island using analytical hierarchy process (AHP) and SWOT analysis. (2025). BIS Energy and Engineering, 2, V225019. https://doi.org/10.31603/biseeng.360